Walk the site
Check entrances, lift capacity, loading bays, parking, stair routes and any landlord or building-management rules.
Add site access detailsL4066, Waterford, Ireland
A badly sequenced office move can cost more in lost trading time than the removal itself. Ace Moving Co plans office removals in Waterford around your working hours, access rules and handover date, with phased loading and careful equipment handling built into the schedule.
We work with start-ups, professional offices, shops, cafes, restaurants, schools, colleges, warehouses and light-industrial sites. Keep Monday moving.
We plan around what must be ready first: staff workstations, customer areas, classroom equipment or stock locations. Different premises. Different loads.
Move desks, chairs, meeting-room furniture and boxed files between city offices or business parks.
Plan an office moveKeep stock grouped by department and agree how counters, rails, display units and signage travel.
Plan a shop relocationSchedule seating, service counters, kitchen fixtures and dry stock around closure and reopening times.
Discuss a venue moveGroup classroom furniture, teaching equipment and archive boxes by room or department.
Discuss an institutional movePlan shelving, racking and palletised goods in load groups that are easier to place at the new site.
Plan warehouse movingSet out handling needs for work benches, light machinery and parts before the move date.
Talk through site needsA site walk-through and a clear sign-off route catch access issues early. Decide before lift-off.
Check entrances, lift capacity, loading bays, parking, stair routes and any landlord or building-management rules.
Add site access detailsSeparate items to move, store, dispose of or return to suppliers. Flag fragile and specialist equipment.
Discuss your inventoryBreak the work into department blocks, with a cut-off time and destination area for each phase.
Outline the move phasesAgree who approves each phase and who the crew contacts on the day if access or timing changes.
Name your move contactWe agree how each item is wrapped, labelled and placed before collection. Your own IT provider should disconnect servers, network equipment and any system that needs a controlled shutdown.
Desks, chairs, cabinets and display units are protected and loaded with their shape, weight and destination in mind.
Bag fittings and cable accessories, then label them against the matching desk, fixture or department for quicker placement.
We can move disconnected monitors, printers and agreed equipment on a move-and-place basis. Your IT provider handles decommissioning, reconnection and testing.
Tell us the dimensions, weight and access requirements for light machinery so we can discuss suitable handling and loading arrangements.
Give every load a destination before it leaves. Keep each line together.
Keep boxed, bagged and hanging goods separate by department, so each group arrives in its planned area.
List counters, fridges, display units and signage, then agree which assemblies need dismantling and placement.
Group shelving and racking parts by bay or section. Mark the intended layout before loading begins.
Use an agreed inventory reference for each phase, giving your move contact a practical way to check loads at the destination.
Build the schedule around opening hours, staff access and the date the new premises will be ready. Keep the doors on your terms.
Move agreed areas after staff and customers have left. Set a clear finish time and list what must be ready before opening.
Ask about evening schedulingUse a closed day for a larger move or a defined handover phase, with access and building rules checked beforehand.
Ask about weekend schedulingKeep selected teams or trading areas running while other sections move. Temporary storage can be discussed if the new site is not ready.
Plan a phased relocationFit-out, signage or utility delays can shift a handover. Tell us which dates are fixed and where you need room to adjust.
These are example schedules, not guaranteed results. The premises, access, inventory and agreed crew plan set the real timing.
Group desks and department equipment in advance, move in planned blocks, then place priority workstations first at the new site.
Planning focus: building access, IT disconnection by your provider, labelled destinations and a named sign-off contact.
Separate boxed goods from fixtures, mark destination zones and agree which counters or display units need to be placed first.
Planning focus: stock references, loading sequence and the opening tasks your team will handle after the move.
Move shelving sections and grouped stock in stages, with a load map that ties each phase to its destination area.
Planning focus: access windows, inventory checks and confirming the new site is ready for each load.
Tell us your premises size, access details, target date and any phases you need. We’ll discuss the move plan and set out the agreed scope clearly.
Quotations separate labour, transport, materials and out-of-hours scheduling, so the cost lines are clear.